Schedule C - Legal Description of Ground Lease Property A parcel of land in the South Half of Fractional Section 23, and the North Half of Section 26, Township Thirty- seven North, Range Nine West of the Second Principal Meridian in the City of Xxxx, Lake County, Indiana, ( said parcel consisting of parts of Parcels 2, 3, and 4 conveyed to Xxxxxxxxxx Harbor Riverboats L.L.C. License from Indiana Department of Transportation for curbing and lighting DOT property adjacent to entryway. License from Indiana Department of Transportation for landscaping DOT property adjacent to entryway. Assignment and Assumption Agreement by and between Elgin, Joliet and Eastern Railway Company and Xxxxxxxxxx Harbor Riverboats, L.L.C., dated as of Jand filed for record in Lake County, Indiana. Grant of Exclusive Easement by and between Elgin, Joliet and Eastern Railway Company and Xxxxxxxxxx Harbor Riverboats, L.L.C., dated Jand filed for record in Lake County, Indiana, excluding therefrom, however, any right to construct any "Overpass" (as such term is defined in such JGrant of Exclusive Easement). Easement Agreement by and between Xxxxxxxxxx Harbor Riverboats, L.L.C., and Elgin, Joliet and Eastern Railway Company dated Jand filed for record in Lake County, Indiana on Augas Instrument No. Amendment to License by and between Elgin, Joliet and Eastern Railway Company and Xxxxxxxxxx Harbor Riverboats, L.L.C., dated Jand filed for record in Lake County, Indiana on Jas Instrument No. License by and between Elgin, Joliet and Eastern Railway Company and Xxxxxxxxxx Harbor Riverboats, L.L.C., dated Februand filed for record in Lake County, Indiana on Jas Instrument No. Special Warranty Deed between Xxxxxxxxxx Harbor Riverboats, L.L.C., and Elgin, Joliet and Eastern Railway Company dated Jand filed for record in Lake County, Indiana on Augas Instrument No. Special Warranty Deed between Elgin, Joliet and Eastern Railway Company and Xxxxxxxxxx Harbor Riverboats, L.L.C., dated Jand filed for record in Lake County, Indiana on Augas Instrument No. Overpass. (as such term is defined in such JAgreement). The Fontaine Overpass approach ramp is within the property lines with a notation on the ALTA survey that abutters rights have been relinquished to the State of California. SH 31 at FM 2311 intersection – Construct Overpass Projects recommended for Appendix D Appendix D contains projects that are scheduled for implementation beyond the four years of the TIP time frame and may be under some phase of development as identified within the TxDOT Unified Transportation Program. Overpass and local road improvements associated with Rockport RoadA written notice of scheduled Design Reviews shall be submitted to IFA at least one week prior to any review.The Project Schedule shall include the agreed-upon Design Review Plan and Schedule for all Design Units, including their components, design safety assessment, and elements.Īs an Exhibitor at AIM, every exhibiting company, organization and agency shall hold harmless Overpass Farms Inc., Regional Municipality of Corman Park, GVIC Communica- tions Corp.Įxamples of required design submittals may be, but are not limited to: Concept, vertical profile of Top of Rail, 30% plans and final plans The following submittals will require a Professional Engineer, (PE) stamp: Overpass design Underpass design Hydraulic study Any non-standard design of a structure which will carry train loading Work covered by a submittal shall not be performed in field without receiving Acceptance from BNSF. Route 47 (Terminal Island Freeway) construct interchange at Ocean Boulevard Overpass in the City of Long Beach in Los Angeles County.Ĭontract 5-17 (Cecil Street Overpass Approaches) – Work is complete. Pedestrian Overpass Justification (L&D Section 1404.4) 201.2.1 PROFILE FOR EACH BRIDGE ALTERNATIVE The profile for each bridge alternative considered shall generally be drawn to a scale of 1”=20’ and shall generally be taken along the proposed centerline of survey for the full length of the bridge. The necessary right-of-way for the Okeechobee Overpass over the Florida Turnpike.Ĭonsultation with Board Attorney on legal issues pertaining to the Project Development, Operation & Maintenance Agreement for State Highway 365 and Advance Funding Agreement for US 281/Military Highway Overpass Projects (Section 551.071 T.G.C.).
0 Comments
Leave a Reply. |